This project consists of design and construction of enhancements to the bridge fa├žade, tender house, Jersey barriers, lighting, large tensioned sails at each end of the bridge (four total) and computerized uplighting, artwork on bridge facades, land-based lighting, and a pedestrian esplanade under the bridge connecting restaurants and buildings from the south to the north. The design/build team will be responsible for complete design, permitting and coordination with the Florida Department of Transportation (FDOT). Construction of is anticipated to commence in November 2017 and continue through Summer 2019.